The largest payments for 16 years of work:
- 106 mln. rbl. - collapse of the road tunnel's site during civil work
- 62,9 mln.rbl. - collapse of a tunnel during construction of Dzhubga-Sochi highway at the Sochi bypass section, Krasnodar Territory
- 60 mln. rbl. - collapse of the arch of the tunnel's time lining in the course of the time fastening' partition
- 54.9 mln. rbl. – destruction of three construction cranes due to a construction site fire
- 30 mln. rbl. - breakage of the import tunnel boring machines complex's equipment as a result of the fire
- 13 mln. rbl. - washout of the earthen cloth as a result of the typhoon's passage during the motorway's reconstruction
- 11,3 mln. rbl. - destruction of mooring's designs during civil work owing to a storm
- 10.0 mln. rbl. – damage to engineered structures due to heavy rains during reconstruction of Sochi airport
- 9,7 mln. rbl. - land subsidence at construction of a motorway
- 9,4 mln. rbl. - damage of 37 cables of communication at the underground collector's construction
- 8,7 mln. rbl. - damage of the tunnel boring machines complex's elements during works on their installation
- 6,8 mln. rbl. - damage of the beam during the guyed bridge transition construction through river Moscow
- 3,7 mln. rbl. - frost penetration of the concrete laid in a design because of extremely low temperatures
- 5,7 mln. rbl. - falling of an arrow of chisel installation at the traffic intersection's construction
- 4,7 mln.rbl. - theft of a truck crane while on route to the construction site
- 4.2 mln. rbl. – damage to SCANIA dump truck resulting from a traffic acciden
- 3,9 mln. rbl. - damage of support at construction of the bridge
- 3,5 mln. rbl. - damage of the existing bridge by building technics during performance of works on construction of road
- 3,2 mln. rbl. - collapse of the timberings at concreting overlapping a road tunnel
- 3.2 mln. rbl. – theft of an Ivanovetz crane
|
|